TSX-V EVNI $0.31

Achievements for 2024

December 2024 Millerite identified as dominant nickel sulphide mineral at Gemini Zone increasing potential for critical mineral recoveries. 2025 Exploration Program scheduled to begin in January to further explore the Gemini North Zone.
November 2024 Assay results for precious metals associated with elevated nickel mineralization in new large scale Gemini North Zone, associated with CarLang C Area approximately 2.5km north of the nearby CarLang A deposit.
October 2024 Drill results on new large scale Gemini North Zone identify magmatic nickel sulfide mineralization potentially similar to Mt. Keith Style of nickel mineralization
October 2024 Drill results on new large scale zone – long drill intercept of 0.30% Ni over 241.70 m including 0.96% Ni over 1.5 metres and drilling confirmed similar large-scale nickel mineralization over the interpreted 7 km strike of favourable geology.
September 2024 Drill results on Langmuir #2 high-grade target intersects 18.5 metres grading 1.07% Ni including 2.0 metres grading 3.27% Ni confirming presence of high grade nickel sulphides below the historic mine.
June 2024 Surface sample results extend large scale nickel mineralization across CarLang B target area. CarLang B area highlight the potential of the CarLang Trend to host multiple, outcropping and near surface deposits of similar, or better, nickel grade than the CarLang A Deposit.
April 2024 Fully funded exploration program launched. A systematic exploration program consisting of geophysical surveys, metallurgical test work, surface mapping and sampling and diamond drilling along the prospective 10 km+ CarLang Trend has been designed to continue to advance the Company’s at-surface large scale, CarLang A Nickel Deposit and includes diamond drill programs on its priority, high-grade nickel targets contained within the Shaw Dome Property
March 2024 EV Nickel Announces Closing of $5.12 Million Flow-Through Financing.